An FRC season, step by step
Our challenges
Train, discover the year’s game, design a robot in a few weeks, then put it to the test in competition: here is how a season unfolds at Hyperion.

The competition
What is FIRST?
The FIRST Robotics Competition combines the excitement of sport with the rigour of science. Under strict rules, with limited time and resources, teams of high school students raise funds, build their brand and build an industrial-size robot to compete against other teams.
Volunteer mentors, often professionals, guide each team. It’s the closest thing to a real engineering project in high school.
01 · Back to school
Training before the big challenge
From the start of school in September until Kickoff in January, the shop becomes a school. New members learn the basics from returning students and mentors, then everyone finds the workshop that sparks their interest.
Building next season’s robot ahead of time is not an option: FIRST rules forbid any major mechanism made before Kickoff, and code or designs prepared in advance are only allowed if they were published for every team. Fall is for learning and practice.
Mechanical
Shop safety, using tools, reading drawings, first 3D designs (CAD) and first machined parts.
Programming
Robot code basics: spin a motor, read a sensor, then chain moves without a driver, just like in the autonomous period.
Electrical
Batteries, wiring and electrical safety, plus the robot’s control system: controller, radio, motors and sensors.
Media
Photo, video and social media, the team’s image and finding sponsors to fund the season.
Fall challenges
- Welcoming new members and passing on what returning members have learned.
- Working safely: safety glasses, tools and shop rules come first.
- Learning the rules of the FIRST Robotics Competition and its values, Gracious Professionalism and Coopertition.
- Getting ready for the season: recruiting, finding sponsors and organizing the shop to be ready on Kickoff day.
02 · The game of the year
REBUILT, the 2026 season game
Every January, FIRST reveals a brand-new game at Kickoff and publishes its manual: the field, the match rules and the robot limits. Every team in the world discovers the challenge on the same day. The 2026 game, REBUILT, is part of the FIRST AGE season, inspired by archaeology.
Two alliances of three robots face off for 2 min 40 s. They score by shooting foam balls, called FUEL, into their HUB, cross obstacles, and end the match by climbing their TOWER.
The field
FUEL
Foam balls 15 cm (5.9 in) across. 504 are in play: most of them in the middle of the field, the rest in the DEPOTS, at the OUTPOSTS and up to 8 preloaded in each robot.
The HUB
Each alliance’s target: a hexagonal opening 1.06 m (41.7 in) wide, 1.83 m (72 in) off the floor. Scored FUEL comes back out at the bottom, toward the middle of the field, and lights show whether the HUB is active.
BUMPS and TRENCHES
To cross the field, a robot drives over a 16.5 cm (6.5 in) bump, or under a trench with 56.5 cm (22.25 in) of clearance, which means being low enough.
The DEPOT
A store of 24 FUEL at the foot of each alliance wall, where robots can help themselves.
The OUTPOST
The human player’s station: they feed FUEL onto the field, collect it from robots, or shoot it into the HUB themselves.
The TOWER
A tower nearly 2 m (78 in) tall, built into each alliance wall, with three rungs at 68 cm, 1.14 m and 1.60 m (27, 45 and 63 in). Robots climb it, mostly at the end of the match.
The match, second by second
01
Autonomous · 20 s
Robots play on their own, with no driver, following their code. Both HUBS are active; a robot may also climb to the first level of the TOWER.
02
Transition · 10 s
Drivers take the controls. Both HUBS stay active.
03
Four shifts · 4 × 25 s
Only one HUB is active at a time, alternating. The alliance that scored more FUEL in autonomous starts with its HUB off. With your HUB off, you collect FUEL or play defense.
04
End game · 30 s
Both HUBS light up again for the last shots, and robots climb the TOWER.
So a strong autonomous comes at a price: you start the shifts with your HUB off. This is the kind of trade-off the team works out on Kickoff day.
Scoring
| Action | Autonomous | Teleop |
|---|---|---|
| FUEL in an active HUB | 1 | 1 |
| FUEL in an inactive HUB | 0 | 0 |
| TOWER level 1: robot off the floor | 15 (2 robots max) | 10 |
| TOWER level 2: bumpers above the low rung | — | 20 |
| TOWER level 3: bumpers above the mid rung | — | 30 |
Ranking points
In qualification matches, each match also earns ranking points (RP) for the whole alliance:
- Win: 3 RP; tie: 1 RP.
- ENERGIZED: 1 RP for scoring at least 100 FUEL.
- SUPERCHARGED: 1 more RP at 360 FUEL.
- TRAVERSAL: 1 RP for at least 50 TOWER points.
Thresholds for regional and district events; they may be higher at championships.
The 2026 robot by the numbers
- 52.2 kg (115 lb) max without bumpers or battery, 61.2 kg (135 lb) with bumpers.
- A frame perimeter of at most 2.79 m (110 in), and never taller than 76.2 cm (30 in).
- A mechanism may reach out at most 30.5 cm (12 in) beyond the frame, on one side at a time.
- No single part worth more than US$600 (except Kit of Parts items), and no major mechanism built before Kickoff.
Summary of the 2026 Game Manual published by FIRST at Kickoff. Team Updates during the season may change some details. The 2027 game will be revealed at Kickoff on January 9, 2027.
03 · Design and build
From Kickoff to robot in under two months
On Kickoff day, the countdown starts. In a few weeks, the team goes from a blank page to a robot of about 50 kg (110 lb) that has to work from the very first match.
Kickoff → first competition
- Break down the game We read the manual together and work out what each action is worth. In 2026: is it better to shoot lots of FUEL, or to go for level 3 of the TOWER, worth 30 points?
- Pick a strategy We decide what the robot will do, and what it won’t: go under the TRENCH or over the BUMP, shoot from far or close, climb or not. A simple, reliable robot often beats a complicated one.
- Prototype Wood, cardboard, 3D printing: we quickly build test intakes, shooters or climbers to see what really works.
- Design in 3D The whole robot is designed on the computer (CAD) before it is built, part by part, within the allowed weight and size.
- Build and wire Machining, cutting and assembly, then wiring the motors, sensors and battery.
- Program and practice Code brings the robot to life, including its 20 seconds of autonomous play. Then the drivers practice until competition.
04 · Competitions
Game day: how a competition works
Hyperion competes against teams in Montreal, Trois-Rivières, Toronto, New York State, and all the way to the World Championship. A regional event lasts about three days and brings together dozens of teams.
Day 1 · Arrival
- Inspection On arrival, the robot is weighed and measured, and its bumpers and safety are checked. No inspection, no matches.
- Practice matches To tune the robot on the real field before points count.
Day 2 · Qualifications
- Qualification matches Every team plays the same number of matches, each time with two partners assigned by the system. Rankings follow the average ranking points earned.
Day 3 · Finals
- Alliance selection The top 8 teams become alliance leads and each pick two partners, snake-style: 1 to 8, then 8 to 1. Students represent the team at the microphone.
- Playoffs The 8 alliances play a double-elimination bracket: an alliance is out only after two losses. In the finals, the first to win two matches takes the event.
- Awards Judges meet teams throughout the event. The FIRST Impact Award, the most prestigious, honors a team’s impact on its community; other awards recognize design, programming, team spirit or rookie teams.
The basic rules, every year
- Two alliances, red and blue, of three robots each. Every match starts with an autonomous period where robots play on their own.
- The drive team has at most five people: up to three students as drivers or human players, a coach and a technician, with no more than one adult.
- Fouls give points to the other alliance (in 2026: 5 for a minor foul, 15 for a major foul). A yellow card is a warning; a second one in the same phase of the event turns red and disqualifies the team from the match.
- Gracious Professionalism: play to win, but with respect, helping other teams, for example by lending a part or a hand in the pits.
- Coopertition: work with today’s opponents, who may be your partners in the next match.
On to the World Championship
At each regional, teams earn points for their ranking, alliance selection, playoffs and awards. The top teams qualify directly for the FIRST Championship; the others are ranked together on their first two regionals, and more spots open up every week. In 2026, about 600 teams qualified for the April event, split into eight divisions, with alliances of four robots.
Want to take on the challenge with us?
Beginner or enthusiast, there is a place for you in one of our four workshops.